SAP S/4 HANA : CO Product Costing flow for ETO Scenario

ETO - Product Costing flow for Engineer-to-Order production-Production Process using Projects ,WBS Elements and Networks

3.95 (18 reviews)
Udemy
platform
English
language
Finance
category
SAP S/4 HANA : CO Product Costing flow for ETO Scenario
78
students
8.5 hours
content
Oct 2022
last update
$44.99
regular price

What you will learn

Step by step by configuration for Product costing

Step by step by configuration for Product costing with PS module relating to ETO scenarios

SAP CO: Product Costing flow for ETO Scenario with Production order

SAP CO: Product Costing flow for ETO Scenario without Production order

Why take this course?

Engineer-to-Order (ETO) product costing flow in SAP S/4 HANA, which is often associated with the Project Systems (PS) module due to its project-oriented nature.


ETO is a strategy where products are manufactured based on each specific customer's requirements. It involves unique designs and specifications for every order, requiring close integration of sales orders, design, manufacturing, and costing.

A) ETO Production Process with Production Order

  1. Project Creation: Upon receiving a sales order, a Work Breakdown Structure (WBS) element is auto-generated. This is achieved by having a standard project template with predefined WBS elements and networks.

  2. Design Phase: This includes designing the BOM (Bill of Material) and Routing, which lay out the materials required and the production steps, respectively.

  3. Production Order Creation: A production order is generated with reference to the WBS. This production order gets its BOM and routing from the ETO product.

  4. Goods Issue: Materials required for production are consumed. This process reduces inventory and books the costs to the production order.

  5. Activity Confirmation: The labor hours and machine hours used in the production process are confirmed, recording the actual time taken for each operation.

  6. Goods Receipt: Once the production is completed, the finished goods are received into stock. This results in capitalizing the finished product's cost.

  7. Variance Calculation: Differences between planned and actual costs are determined.

  8. Settlement: The costs accumulated on the production order are settled to the WBS element.

  9. Billing & Revenue Recognition: Once the product is delivered to the customer, billing is done. The revenue is captured at the WBS level.

  10. Results Analysis (RA) Key Calculation: Determines profit/loss by comparing the revenue against the costs.

  11. COPA Settlement: The profitability of the order is analyzed by settling the data to Controlling Profitability Analysis (COPA).

B) ETO Production Process without Production Order

  1. Project Creation: Similar to the above process, a WBS element is auto-generated upon receiving a sales order using a standard project template.

  2. Work Centers & Activities: Define work centers for different activities like machining, labor, etc.

  3. Goods Issue: Materials are issued directly to the WBS element, thereby reducing inventory and booking costs to the WBS.

  4. Activity Confirmation: Labor and machine hours are confirmed directly against the network activity.

  5. Results Analysis (RA) Key Calculation: Determines profit/loss by comparing the revenue (from billing) against the costs accumulated at the WBS element level.

  6. COPA Settlement: The profitability is analyzed by settling to COPA.

Conclusion: In ETO scenarios, the SAP Project Systems (PS) module's integration with Controlling (CO) and Logistics (LO) is crucial. Whether with a production order or without, it's essential to maintain transparency of costs and revenues associated with each project. SAP's ability to link these elements ensures accurate cost tracking and profitability analysis for ETO scenarios.

Screenshots

SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Screenshot_01SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Screenshot_02SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Screenshot_03SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Screenshot_04

Reviews

Robert
August 3, 2023
Working on the PLM side I wanted to see what could be quoted during the design phase. While I don't have the accounting background to understand everything I saw, I was able to discern where the integration between PLM and ERP would be during an ETO process. This brought forth many more questions I need to get answered before I can fully understand the PLM/ERP relationship and process during ETO.
Mayur
June 30, 2023
The way of presenting the concept is very nice. Touched all important points required for configuration.
Kamlesh
February 26, 2023
Sree while creating Auto WBS creation during Sales order, I was getting Network Error. However that got resolved after creation of scheduling or availability check (OPJK) in network as that was missed in the videos.

Charts

Price

SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Price chart

Rating

SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Ratings chart

Enrollment distribution

SAP S/4 HANA : CO Product Costing flow for ETO Scenario - Distribution chart

Related Topics

4946758
udemy ID
10/26/2022
course created date
11/2/2022
course indexed date
Bot
course submited by