Quantity Surveying and Estimation for Roads and Tunnel Works

Roads, Tunnel and utilities complete Estimation Solution of Quantity take-off, Rate Analysis, BOQ with AutoCAD and Excel

4.50 (79 reviews)
Udemy
platform
English
language
Other
category
instructor
429
students
16.5 hours
content
Dec 2021
last update
$99.99
regular price

What you will learn

Quantity Surveying and Estimation project based training and practise

Complete case study of 1.5 Km Road by QS perespective

Complete Tunnel Take off and estimation of tunnel by QS perspective with real project documents

Bar bending Schedule of Different structure like jersey barrier, Box type tunnel

Description

The name of the course Quantity Surveying and Estimation for Road, Highways and Tunnels is an effort to provide project-based training that will help students to build their knowledge and confidence.

So what we learn in this course?

First, I divided this course into Fourteen sections that comprise 60 HD lectures along with specified resources. These sections will deal with introducing the course, basic to dvance training of Excel and AutoCAD and extensive focus has given to the bill of quantities. Furthermore, complete items that are part of the road are discussed one by one with a proper practical method. The last section is designed to give students an understanding of rates and analyses and how we can build a new rate.

After you talk about this course what you will able to deliver?

You will understand the variation procedure from basics to advance level.  This course mainly focuses on the practical computation of Civil works, different road structures, Road signage, Road markings, Traffic Light signals and Traffic management.

Who is for this?

If you are a quantity surveyor, Cost consultant, project manager, project engineer, Site Engineer or those who want to get the basic to advance knowledge of road project then this course is ideal for you. Let’s join me on this journey.


I welcome you all to this course that will add up some new skills in your career journey.

Screenshots

Quantity Surveying and Estimation for Roads and Tunnel Works - Screenshot_01Quantity Surveying and Estimation for Roads and Tunnel Works - Screenshot_02Quantity Surveying and Estimation for Roads and Tunnel Works - Screenshot_03Quantity Surveying and Estimation for Roads and Tunnel Works - Screenshot_04

Content

Introduction

Introduction
1. Introduction to the course
2. Responsibilities of Quantity Surveyor
Understanding Road Related Items

Basic understanding of Excel

Basic Intro to excel Application of Excel
2. Excel Start working from zero Quantity sheet making Part 1
Excel Start working from zero Quantity sheet making Part 2
4. Use of Excel formula in Road context
5. Excel Repeated Commands and actions

AutoCAD for road Quantity surveyors

AutoCAD Start from Basic and understand Qs need of AutoCAD
AutoCAD Line, Polyline and Area Calculation and much more
Understanding AutoCAD Hatch, Area, Leader and Text
AutoCAD Arc and Circle Speed the estimation process
5. Drafting setting for accuracy

Understand the Drawings of Road Trade

Understand of Road Drawings
Understanding Plan Section and Details of Roads
Extract Measurement from the Drawings

Measurements in Quantity Surveying and Bill Of Quantities

Measurements its Use and importance
What is Bill of Quantities and its types

Bill Of Quantities, Specification and Demolition

BOQ, Specification and Quantification of Demolition

Earth Works

Earth Excavation Part 01 - Excavate to Rough Grade
Earth Excavation Section 02 - Earth Excavation Section 02
Earth Excavation Section 03 - Excavate to Rough Grade
Imported Filling Section 01
Imported Filling Part 02

Road Structure - Pavements

Road Structure 01 - Asphalt Concrete Surfaces Course
Road Structure 02 - Asphalt Concrete Base Course
Road structure - Bituminous Prime/Tack Coats, Aggregate Base Course

Road Edges and Barriers

Road Edges
Road Edges - Precast concrete curbstone for 15 cm raised
New Jersey Barrier including 100mm thick unreinforced base course reinforcement,

Road Markings

Road Marking Part 01 Non-reflective pavement markers - White (Ceramic type)
Non-reflective pavement markers - White (Ceramic type),Non Ceramic Tile

Road Traffic Signs (warning & regulatory)

Single, double, and triple tubular post with one traffic sign
Single, double, and triple tubular post with one traffic sign

Rate Analysis and Determine Unit Rate Cost and Quantity Breakdown Structure

Rate analysis general concept
How to do anaylsis of rate
Rate Breakdown Example
Unit Rate Analysis 02
Work Breakdown and Rate anaylsis 01

Reviews

Masenge
September 2, 2021
yea i already started learning the best. Just to ask, can you share the tutorials to my email please.
Goutham
April 18, 2021
Very good lectures who is aspiring to be quantity surveyors... i feel add some more lectures on rate analysis in depth about coerficients and all for 100cum of work this is the rate. In 100 cum of work what if the coefficient of machinery, manpower?...

Charts

Price

Quantity Surveying and Estimation for Roads and Tunnel Works - Price chart

Rating

Quantity Surveying and Estimation for Roads and Tunnel Works - Ratings chart

Enrollment distribution

Quantity Surveying and Estimation for Roads and Tunnel Works - Distribution chart
3447942
udemy ID
8/25/2020
course created date
8/28/2020
course indexed date
Bot
course submited by