Primavera P6 latest edition Training Course and Tutorial
Learn practical application, Installation, and Project Management using P6 Software
What you will learn
Learn Primavera P6 Overview Course and Tutorial-Practical Training in a live software with a Technical Support
How to install Primavera P6
How to build a solid schedule in Primavera P6
Adding resources, Printing layouts, and critical path analysis
Description
Learn Primavera P6 Overview Course and Tutorial
1. Lecture 1 link:
lecture 1 explain P6 History, P6 Features, P6 Tools, P6 Interface, Critical Path, and CPM technique and terms
2. Lecture 2 Link:
How to download and Install Primavera P6
How to download and install Primavera P6 and Database Configuration on your laptop and be an expert in Primavera
• In this Lecture:
• Installation Guideline step by step with a screenshot
• Database Configuration
3. Lecture 3
Create Project and WBS Details
4. Lecture 4 in Oracle Primavera P6 –Activities:
Adding activities and Creating Links
5. Lecture 5 in Oracle Primavera P6 –Resources:
Definition of resources, types and details of the resources addition - Measurement units - Prices - Resources codes - How to classify resources to its workers, tools and equipment on the Primavera software last version
How to create Cost accounts for activities and also resources –Adding units to resources –assigning resources and unites and calculate Costs from Units
6. Lecture 6 in Oracle Primavera P6 –Create Baselines
Create Baseline the Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.
7. Lecture 7 in Oracle Primavera P6– Progress Update
Update the schedule regularly and compare it to the baseline to ensure that resources are being used effectively, project costs are being monitored against the original budget, that there is a knowledge of actual duration and costs in order to initiate contingency plans if necessary.
Ask the following questions when updating:
· What information needs to be collected to update the project and what method(s) will be used to collect information?
· Who will gather the necessary information used for the project update?
· How often should the project be updated?
· Are resources local or offsite?
· Who will need to see the results of the update and when are these results needed?
· What types of information will be generated after each update in order to communicate progress before the next update period?
Content
P6 Overview and History
Lecture 2 How to download and Configuration
Lecture 3 Create Project and WBS Details
4. Lecture 4 in Oracle Primavera Ver 18.8 –Activities
Lecture 5 in Oracle Primavera Ver 18.8 –Resources:
Lecture 6 Oracle Primavera Ver 18.8 –Create Baselines
7. Lecture 7 Oracle Primavera Ver 18.8 – Progress Update
Live Installation in Primavera P6 Ver.18 on the software for who have Problem
Lecture 9-Earned Value Management Overview-KPI’s
Lecture 10: Activities Renumbering
How to schedule Three Projects Together
Writing in any Language in P6
Lecture 13:Level of effort Activities
Lecture 14: Activity steps
Project Calendars
3 Week-3 Month Look ahead schedule
Critical Path definition
Screenshots
Reviews
Coupons
Submit by | Date | Coupon Code | Discount | Emitted/Used | Status |
---|---|---|---|---|---|
- | 5/20/2019 | ALIPRIMAVERAP6 | 100% OFF | expired | |
- | 5/20/2019 | ALIPRIMAVERAP6_Q | 100% OFF | expired | |
- | 7/13/2019 | ORACLEP6 | 100% OFF | expired | |
- | 7/14/2019 | FREEPRIMA | 100% OFF | expired | |
- | 8/16/2019 | ORACLEPRIMP6-FREE | 100% OFF | expired | |
- | 8/19/2019 | ALIPRIMAVERAP6-TUT | 100% OFF | expired | |
- | 9/16/2019 | ALIPRIMAVERAP6_BN | 50% OFF | 200/0 | expired |
- | 10/9/2019 | ORACLE-PRIM-P6 | 50% OFF | 500/3 | expired |
- | 10/24/2019 | 48FC276DF164B988082A | 81% OFF | expired | |
Lee Jia Cheng | 1/12/2020 | UPDATED-P6-COURSE | 93% OFF | expired | |
Lee Jia Cheng | 4/8/2020 | PRIMVA-19.12 | 94% OFF | expired | |
Lee Jia Cheng | 4/10/2020 | P6-COUPONS | 90% OFF | expired | |
- | 5/3/2020 | ORCALEPRIMAV9.9 | 95% OFF | expired | |
- | 6/6/2020 | P6FOR9DOLLAR-COUPON | 95% OFF | expired | |
Angelcrc Seven | 7/7/2020 | PRIMVAERA5DAYS | 95% OFF | expired | |
Lee Jia Cheng | 8/6/2020 | PRIMAVERA-P6-COUPON | 95% OFF | expired | |
Angelcrc Seven | 11/28/2020 | P6-ORACLE | 95% OFF | expired | |
- | 12/5/2020 | P6DISCOUNT-P6 | 95% OFF | expired | |
- | 4/6/2021 | 9.9P6-PRIM | 91% OFF | expired | |
- | 12/9/2021 | 517872F50B116BA0797F | 91% OFF | expired |